Laminate Flooring Recap - Day 3

Roll the clock back a couple of days, here's what happened on project day 3:
8:30 - move refrigerator, pull linoleum with my daughter's help ;). Take out remaining floorboard. Resume laying down laminate.
Noon - break for lunch which we could assemble in the little remaining kitchen space.
12:30 - back to the boards.
2:15 - enough of the floor done to put the fridge back and rip some more linoleum.
2:30 - done for the day. Time to clean up to celebrate my birthday with extended family.

4 more boxes placed, about 1/2 the width of the floors completed.

The time with family was a welcome break, getting all of us out of the house for an extended period of time and away from the noise of construction. Unfortunately, dinner wasn't much quieter and my head was not clearing up.