Tuesday, February 17, 2009

Laminate Flooring Recap - Day 4

I should have been at work. I was planning on going to work. The head cold/virus/whatever had other plans for me. It really would not have been pleasant for coworkers to have to deal with me -- the drugs weren't working well enough and my headache and general exhaustion was debilitating. Instead, with the kids home for President's day and my wife having to sacrifice her day to be home with them, I fought through the pressure to try to complete more floor, taking a much easier pace and trying to return the home back to normal sooner.

8:30 - after eating a granola bar, started placing more wood. Today will include cuts around the island (which should be highly entertaining given my mental state and mood) thankfully followed by long runs of open space.
10:00 - start working island.
10:36 - the first row at the island is in. Examined remaining space and decided it best to move the stove.
11:03 - vacuumed out the work area, threw the circuit breaker and pulled out the stove. OMG are the sides of the stove and the floor under it disgusting. There's barely an eight of an inch (1/8") gap to the counter on either side, but liquids and small crumbs have found their way into a protected area.
11:21 - stove is out, linoleum under it is removed.
Noon -Lunch.
12:20 - back at it, groaning a little.
12:50 - 1:10 - Hobby Horse repairs: 4 new springs placed, attempted to run a stringer between support bars for the feet, but the rod is a little too wide.
2:30 - the width of the island has been covered. Several PITA pieces to cut, but they're done. Wife starts helping as Little Trooper is napping and our lady in waiting is entertaining herself with TV and playtime in the basement.
3:50 - Little Trooper wakes up, back doing the boards alone (I miss the company)
4:50 - enough of the floor done to put the stove back in place.
5:05 - anti-tip hold down hardware relocated and installed. Determine the original placement never worked. Power restored to the stove and it still works. Done for the day.

5 more boxes completed. Only about 6' of width remain (that's slightly under 1/3 of the floor). Should be interesting to work the vents and around the cabinets.

Addendum:
9:30-10:00 pm - discuss what we're going to do about pantry closet and hallway at the garage door. We're leaning to working those. Fun, especially since the boards in front of the pantry have been in place for days now - we'll be working those in kinda backward. Most likely will need to purchase a direction-change transition runner to go from the kitchen to the hallway.

No comments: