tonight (back to real-time), after a full day away from working the floor, I decided to work in a little bit of flooring between cooking dinner for the kids, starting recorded kid shows, refereeing and time between dinner and bed.

6:30 - 8:30 pm - interspersed putting down rows of laminate with parental duties.

2 more boxes down. Covered about 4x40. We should have around 2 boxes left over. Not too bad considering we purchased based on maximum floor dimensions without accounting for space taken up by cabinets.

The next row starts with ripping down boards to go up against the last set of cabinet faces. Only about 4' left of width to cover. Of course, that includes the work around the cabinets, the door, and the floor vents. Oh, and figuring out the pantry closet and most likely the hallway. I'm reasonably certain at this point we'll end up doing the hallway. Not a large task, just need a piece of transition strip so we can change directions. Then there's figuring out how to end at the stairs and the other transitions/thresholds to do.

I'm going to pretend that all the floorboards are going to stain and install themselves.