This coming weekend doesn't provide much time for working on the floor so I took the opportunity of a small lull at work to flex some time and headed home early to work flooring before the kids came home.

2:45 - start of last row by cabinets, initial pieces needed to be cut down.
3:30 - 4 rows later, start cuts on vents.
4:15 - now the trickier side, the 2nd row at the vents (the way it happened, I had to cut out the majority of the vent from the 2nd row, leaving only 1/4 inch of the board. Decided to lay the row immediately behind at the same time for stability -- to keep from shattering/splitting the 1/4 inch sections.
5:10 - Time to start the last row on the main part of the floor. Each one will be measured and cut as the wall is a little wonky.
6:20 - 6:45 - Eat the dinner my wife kindly brought home.
8:00 - The main area is now done. Yay!

Summary:
4' x 21' aprox (one longer row in front of the cabinets) covered.
3+ (probably 3.5) boxes used.

To Do:
Pantry and hallway. All floorboards (which it seems we're inclined to get a larger, slightly fancier cut to add a further formal touch, stained of course.)

For now, I'm going to relax. After that, I'll see about putting together the photos of each day into a post.


To do: